on that note... being an insomniac, here's a build note...
I figure the way I'm gonna need to do the bed thru the winter while DD Mutt is gonna be to.....
BUY DEATH PROOF DUCK 
j/k
1 - prefab tube bed mount angle iron prior to weekend... also short tube "feet" to weld to em and rear x-member/winch mount material..
2 - pull bed. drill and install angle iron.. tack feet.. fab and tack rear x-member..
3 - do initial outer tube bends... slug/roset outer perimeter and tack to feet...
4 - remove.. reinstall bed... drive...
5 - continue main tube fab, C-hoop, angles, etc and final x-member welding in Dungeon open bay...
6 - periodically reinstall as needed
rinse, repeat...
26 - new fuel tank
31 - Kert's gooseneck box
42 - template, cut and fit 1/4" alum plate using panel mount tabs...
83 - zombie apocolypse...