Ok I have been slacking on keeping this updated. Lots of work has happened, some rework. I will try and summarize to keep myself on track and then update over the next couple days. I am sure they will be out of order, but I'm trying to get this thread caught up.
Got the shims redrilled to sit square with the axle moved forward.
Moved the B52 mounts fwd to improve shackle angle (this is going to cause fabrication with the exo as it mounts to the B52s).
Unwired all unnecessary cab wiring
PSC pump installed.
Ordered all the wiring stuff, Autometer gauges, WFO torque arm, new perches, and rear disc stuff.
Cut hole in floor for clocked case.
Cage floor plates fully welded.
Cage fully bolted in.
DIY4x dash cut and fitted
defrost vents modified
NP205 cleaned and prepped and threads chased
32 spline front output arrived
NP205 case cracked
New round pattern 205 found and bought...Ugh! I pick this up on Friday and start over on the cleaning and painting.