Continuing the progress from the last two days we completed facing out the main part of the cabinet today. Just need to get some hinges to hang all the doors with. This is the cubby area again. We'll face this out in 1/4" oak veneered plywood so it matches. The solid middle section will give me a spot to put charge ports and later the solar controller. The lower shelf has the face board providing a solid lip to keep things from rolling off if I don't get parked level.
Further down the line, ready for the door.
The other end.
Overall shot. I've got my brother in law that works at a heating/ac shop who's going to get me a chunk of stainless to use as the counter top.
This is really the most difficult part of the refurbishing. Thankfully that part is done. We still need to sand and refinish the cabinet, but the rest won't require any heavy construction. Parts still yet to be done are reinsulating the roof and reskinning the headliner, strip the floor of carpet and install vinyl flooring, build the new bench and wire the whole shebang. I hope the weather keeps cooperating as I've got to the first part of June to be ready to roll for the desert trip.
Further down the line, ready for the door.
The other end.
Overall shot. I've got my brother in law that works at a heating/ac shop who's going to get me a chunk of stainless to use as the counter top.
This is really the most difficult part of the refurbishing. Thankfully that part is done. We still need to sand and refinish the cabinet, but the rest won't require any heavy construction. Parts still yet to be done are reinsulating the roof and reskinning the headliner, strip the floor of carpet and install vinyl flooring, build the new bench and wire the whole shebang. I hope the weather keeps cooperating as I've got to the first part of June to be ready to roll for the desert trip.





