The material that I need to remove to create the link length on the upper link (which is the curved one in the picture Above ) I think I’ll take from the straight area before for the bend where it attaches to the frame . Any input on that from others who have done this would be appreciated as far as where to take material all from one side equally on both ends etc...
I’m a little apprehensive on cutting them now before the motor is in but I think it’ll be fine . My only concern is where the axel travel is and what it will run into but I don’t think I will have an issues there’s a lot of space from axel to motor going full hydro steering thoughts ?
There’s some pics @Fastereddie lol
