that was the big hold up, I needed to get alum welding capability.. it's a solid alum piano hinge that I drilled holes in and plug welded to the alum panels..
I'll get into more detailed photos and such as I start actually mounting the drawers...
it's quite a few steps.... first I have to do the face panel/hinge/lower mount... done, other than the final burnishing..
than I need to make 2 more 1/4" spacers tomorrow for the back/sides of the drawers.... than I need to weld 6 of Kert's panel mount tabs to the tubes to bolt it all together... fit drawer, drill for bolts.. mount..
repeat 3 more times...
funny thing is.. every time I put another piece of the puzzle in, it exaggerates the next, needed puzzle pieces... these will really make the front corners look silly..
but I probably wont actually install those till I pull the bed back off for the the tank install..
after the drawers, the doghouse for the tank will be next... I'm thinking of fully fabbing/welding that myself now... the outer weld seams will be rounded and burnished anyway on that......
hopefully I'll have both ds doors kinda on the way to being done tomorrow...