Getting this K5 ready for BB18 is taking more time than expected. My job picked up some extra work for McDonalds, upgrading their network, and it's keeping me working 20-40 hours overtime a week. It has to be done at night so I start around 7:00 pm and finish up around 6:00 am the next morning. Then I get to do my regular work if it's available. I'm not complaining about the paychecks, but it makes it hard to get anything done. I also have chores around the house and misc. repairs or helping someone else in need.
Anyway, just a small update on the "Makeover".
I got with
@GWeakland620 and got some panels ordered. Your are 100% correct, Greg, these panels are superb. Thank you.
I can't wait to get started on the welding to get them done. The first thing I need to do is repair/weld two body mounts underneath the K5. Then I can start replacing the cargo floor with the new panels.
I've got to finish the cage in that area also.
The quarter panels can wait until the rest of the work is done. New engine, transmission, NP241, etc has priority. Not getting the quarter panels done will not keep me from BB18. I'm probably going to need to wait anyway since there is always a possibility of damage.
I worked with Chris
@1977k5 and
@Stephen at ORD on getting the Trail Ready Beadlocks ordered. Possibly a 2 month wait but it could be sooner. I ordered 5 of the HD17s with the World Series ring, 3.5" backspacing.
Thank you Chris and Stephen.
Once I get a break in work I'll get some 42" Super Swampers ordered so they can get here soon.
Other than that, just a waiting game. I will post up some pics as the progess moves forward.